7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
4/27/2023 3:24:51 PM
| bshugart |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
10/19/2021 10:44:22 AM
| amcbroom |
|
IMPACT FEE DUE
| 23-018637 |
4/10/2023 10:26:38 AM
| Lexis |
|
INFO NOC-
| 5498/844 |
3/8/2022 11:45:02 AM
| ccontestabile |
|
LANDSCAPE INSPECTION REQ
| |
7/24/2023 10:20:56 AM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
7/24/2023 12:51:54 PM
| |
|
METER CAN INSPECTION
| |
4/25/2023 12:03:34 PM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| JEA |
8/1/2023 11:49:54 AM
| bshugart |
|
SOLID WASTE FEE DUE
| 22-015160 |
3/8/2022 1:58:54 PM
| dwint |
|
SWALE/CULVERT FINAL INSP REQ
| |
7/28/2023 5:18:11 PM
| air |
|
TERMITE BOND CO
| NADERS; SOIL |
3/8/2022 11:45:15 AM
| ccontestabile |
|
TERMITE PROTECTION CERT OF COMPL
| |
7/24/2023 3:37:33 PM
| bshugart |
|
SEPARATE ROOF PERMIT REQUIRED
| 12301786 |
2/8/2023 9:55:08 AM
| kcooper |