|
7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
4/19/2022 9:32:02 AM
| bshugart |
|
ENGINEER ELEVATION CERTIFICATION
| |
1/3/2022 4:05:29 PM
| kallen |
|
FERWCD FINAL REQ PRIOR TO C/O-692-1513
| |
4/27/2022 9:25:21 AM
| |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
9/15/2021 10:39:43 AM
| tsteven |
|
IMPACT FEE DUE
| 22-025469 |
4/18/2022 10:05:33 AM
| dwint |
|
INFO NOC-
| 5409/1119 |
11/8/2021 8:28:47 AM
| ccontestabile |
|
LANDSCAPE INSPECTION REQ
| |
4/29/2022 9:35:13 AM
| |
|
METER CAN INSPECTION
| |
4/19/2022 12:09:07 PM
| air |
|
SEPTIC TANK FINAL REQ
| |
5/3/2022 6:13:08 AM
| ehealth |
|
SOLID WASTE FEE DUE
| 21-073149 |
11/8/2021 1:15:42 PM
| lnewt |
|
TERMITE BOND CO
| FLORIDA PEST; SOIL |
11/8/2021 8:28:59 AM
| ccontestabile |
|
TERMITE PROTECTION CERT OF COMPL
| |
4/26/2022 3:27:53 PM
| slkling |
|
NEED MECHANICAL PERMIT
| |
5/3/2022 12:55:56 PM
| slkling |
|
HOLD FINAL INSPECTION FOR METAL ROOF PERMIT
| 12202093 |
2/8/2022 12:26:07 PM
| kcooper |