|
7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
12/16/2022 9:50:01 AM
| slkling |
|
ENGINEER ELEVATION CERTIFICATION
| |
1/24/2022 3:57:43 PM
| kallen |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
8/31/2021 1:33:03 PM
| BOCC |
|
HOLD CO FOR PRIVATE PROVIDER CERT OF COMPLIANCE
| |
2/9/2023 4:06:27 PM
| bshugart |
|
IMPACT FEE DUE
| 22-072514 |
11/17/2022 2:05:58 PM
| nbrad |
|
INFO NOC-
| BK 5431 PG 629 |
12/3/2021 11:17:39 AM
| slkling |
|
LANDSCAPE INSPECTION REQ
| |
1/24/2023 1:50:56 PM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
1/23/2023 10:19:46 AM
| |
|
METER CAN INSPECTION
| |
12/13/2022 3:30:26 PM
| Priv Povider |
|
PAID UTILITY RECEIPT REQUIRED
| |
12/1/2021 9:34:43 AM
| cgalloway |
|
SOLID WASTE FEE DUE
| 21-077602 |
12/1/2021 9:41:25 AM
| cgall |
|
TERMITE BOND CO
| TURNER/WOOD |
12/1/2021 9:38:51 AM
| cgalloway |
|
TERMITE PROTECTION CERT OF COMPL
| |
6/10/2022 9:29:12 AM
| slkling |