SJC Home
DescriptionInputDateWho
7th Edition FBC (2020)    
EARLY POWER LETTER REC'D   10/24/2022 4:21:17 PM slkling
ENGINEER ELEVATION CERTIFICATION   3/10/2022 1:00:36 PM dwintons
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL   4/16/2021 11:30:00 AM hsapp
IMPACT FEE DUE 22-058971 9/7/2022 11:58:38 AM Lexis
INFO NOC- 5256/1264 12/29/2021 2:49:38 PM ccontestabile
LANDSCAPE INSPECTION REQ   12/21/2022 8:12:17 AM  
LOT GRADING INSP REQ PRIOR C/O   12/21/2022 8:12:24 AM  
METER CAN INSPECTION   11/9/2022 12:20:16 PM air
PAID UTILITY RECEIPT REQUIRED SJCUD 12/29/2021 2:49:51 PM ccontestabile
SOLID WASTE FEE DUE 21-083668 12/30/2021 3:53:57 PM Lexis
TERMITE BOND CO TURNER; WOOD 12/29/2021 2:49:45 PM ccontestabile
TERMITE PROTECTION CERT OF COMPL   12/16/2022 12:58:17 PM slkling