|
7th Edition FBC (2020)
| |
| |
|
BAY WIND/FPLACE/EAVES/MAX 3 FT. PROJECTION
| |
| |
|
EARLY POWER LETTER REC'D
| |
6/24/2022 3:12:27 PM
| cgalloway |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
3/19/2021 2:22:38 PM
| tsteven |
|
IMPACT FEE DUE
| 22-039573 |
6/13/2022 11:42:09 AM
| dwint |
|
INFO NOC-
| 5374//495 |
9/21/2021 1:11:42 PM
| kcooper |
|
LANDSCAPE INSPECTION REQ
| |
8/22/2023 3:16:46 PM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
8/22/2023 9:43:41 AM
| |
|
METER CAN INSPECTION
| |
6/24/2022 11:48:40 AM
| air |
|
SEPTIC TANK FINAL REQ
| |
8/7/2023 8:04:06 PM
| ehealth |
|
SOLID WASTE FEE DUE
| 22-039573 |
6/13/2022 11:42:09 AM
| dwint |
|
SWALE/CULVERT FINAL INSP REQ
| |
1/16/2024 4:57:15 PM
| air |
|
TERMITE BOND CO
| FLORIDA PEST / SOIL |
9/21/2021 11:10:19 AM
| krobshaw |
|
TERMITE PROTECTION CERT OF COMPL
| |
8/28/2023 8:54:25 AM
| ecannon |
|
INSPECTOR AT FINAL TO CONFIRM WATER SOURCE INSTALLED
| |
1/11/2024 1:47:05 PM
| ccrain |