7th Edition FBC (2020)
| |
| |
|
BAY WIND/FPLACE/EAVES/MAX 3 FT. PROJECTION
| |
| |
|
EARLY POWER LETTER REC'D
| |
3/10/2022 11:05:03 AM
| slkling |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
1/21/2021 10:48:18 AM
| amcbroom |
|
IMPACT FEE DUE
| 22-018176 |
3/21/2022 8:38:55 AM
| dwint |
|
INFO NOC-
| 5384//780 |
10/13/2021 9:13:58 AM
| ccontestabile |
|
LANDSCAPE INSPECTION REQ
| |
3/25/2022 9:39:40 AM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| PER EOR CONSTRUCTED APPROVAL OF DESIGN |
5/10/2022 11:22:12 AM
| |
|
METER CAN INSPECTION
| |
3/11/2022 8:16:04 AM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| COSA-WATER |
10/13/2021 9:13:29 AM
| ccontestabile |
|
SEPTIC TANK FINAL REQ
| |
4/8/2022 10:21:08 AM
| ehealth |
|
SOLID WASTE FEE DUE
| 22-018183 |
3/21/2022 8:45:58 AM
| dwint |
|
SWALE/CULVERT FINAL INSP REQ
| |
5/10/2022 12:14:20 PM
| |
|
TERMITE BOND CO
| BUGOUT; SOIL |
10/13/2021 9:13:45 AM
| ccontestabile |
|
TERMITE PROTECTION CERT OF COMPL
| |
5/10/2022 8:51:17 AM
| alosco |