|
6th Edition FBC (2017)
| |
| |
|
EARLY POWER LETTER REC'D
| |
6/10/2021 9:43:22 AM
| cgalloway |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
10/16/2020 3:55:51 PM
| amcbroom |
|
IMPACT FEE DUE
| 21-039442 |
6/18/2021 10:35:04 AM
| lnewt |
|
INFO NOC-
| BK 5068 PG 1273 |
11/10/2020 2:17:20 PM
| krobshaw |
|
LANDSCAPE INSPECTION REQ
| |
6/30/2021 8:44:05 AM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
6/30/2021 2:22:28 PM
| |
|
METER CAN INSPECTION
| |
6/16/2021 3:48:17 PM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| COSA |
11/10/2020 2:17:32 PM
| krobshaw |
|
SOLID WASTE FEE DUE
| 21-039442 |
6/18/2021 10:35:04 AM
| lnewt |
|
TERMITE BOND CO
| FLORIDA PEST / SOIL |
11/10/2020 2:17:48 PM
| krobshaw |
|
TERMITE PROTECTION CERT OF COMPL
| |
6/17/2021 8:47:36 AM
| kcooper |
|
HOLD INSULATION INSPECTION FOR SPRAY FOAM AFFIDAVIT
| REPORT PROVIDED AT CO. INSPECTION PERFORMED WITHOUT DOCUMENT |
6/29/2021 4:30:36 PM
| jdacosta |