DescriptionInputDateWho
6th Edition FBC (2017)    
BAY WIND/FPLACE/EAVES/MAX 3 FT. PROJECTION    
EARLY POWER LETTER REC'D   3/16/2020 8:21:08 AM cgalloway
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL   10/7/2019 10:56:57 AM kallen
IMPACT FEE DUE 20-034446 6/30/2020 8:52:44 AM Lexis
INFO NOC- BK 4816 PG 1970 10/31/2019 9:10:05 AM krobshaw
LANDSCAPE INSPECTION REQ   7/21/2020 10:04:08 AM  
LOT GRADING INSP REQ PRIOR C/O   7/22/2020 12:49:51 PM  
METER CAN INSPECTION   3/12/2020 12:49:49 PM Air
PAID UTILITY RECEIPT REQUIRED COSA 11/4/2019 11:06:59 AM kcooper
SOLID WASTE FEE DUE 20-034453 6/30/2020 9:01:52 AM Lexis
SWALE/CULVERT FINAL INSP REQ   7/9/2020 3:34:23 PM air
TERMITE BOND CO NADERS / SOIL 10/31/2019 9:10:28 AM krobshaw
TERMITE PROTECTION CERT OF COMPL   7/23/2020 9:38:06 AM cgalloway