6th Edition FBC (2017)    
EARLY POWER LETTER REC'D   11/7/2019 12:25:06 PM ktaing
ENGINEER ELEVATION CERTIFICATION   8/7/2019 1:48:07 PM dgober
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL   5/30/2019 3:35:42 PM kallen
IMPACT FEE DUE 19-061539 11/7/2019 12:29:24 PM hsapp
INFO NOC- BK 4740 PG 1164 6/13/2019 2:05:25 PM krobshaw
LANDSCAPE INSPECTION REQ   11/18/2019 3:57:08 PM  
LOT GRADING INSP REQ PRIOR C/O   11/18/2019 12:10:28 PM  
METER CAN INSPECTION   11/8/2019 11:57:36 AM air
PAID UTILITY RECEIPT REQUIRED COSA-NEED A19 22K CHECK FOR LINE WORK ONLY PER DBORRER 8/22/2019 3:57:35 PM krobshaw
SOLID WASTE FEE DUE 19-061539 11/7/2019 12:29:24 PM hsapp
TERMITE BOND CO FLORIDA PEST / SOIL 6/12/2019 10:52:33 AM krobshaw
TERMITE PROTECTION CERT OF COMPL   11/15/2019 10:51:21 AM cgalloway