|
6th Edition FBC (2017)
| |
| |
|
BAY WIND/FPLACE/EAVES/MAX 3 FT. PROJECTION
| |
| |
|
EARLY POWER LETTER REC'D
| |
8/21/2019 4:13:46 PM
| bcalaman |
|
ENGINEER ELEVATION CERTIFICATION
| |
6/26/2019 2:36:14 PM
| dgober |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
3/6/2019 11:04:39 AM
| kallen |
|
IMPACT FEE DUE
| 19-045579 |
8/21/2019 4:20:38 PM
| hsapp |
|
INFO NOC-
| BK 4699 PG 221 |
5/15/2019 3:16:53 PM
| krobshaw |
|
LANDSCAPE INSPECTION REQ
| |
10/8/2019 4:06:40 PM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
10/8/2019 11:04:40 AM
| |
|
METER CAN INSPECTION
| |
8/21/2019 2:10:52 PM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| COSA - NEED A19-22K CHECK FOR LINE WORK ONLY PER DBORRER |
8/22/2019 4:02:00 PM
| krobshaw |
|
SOLID WASTE FEE DUE
| 19-045580 |
8/21/2019 4:21:17 PM
| hsapp |
|
TERMITE BOND CO
| FLORIDA / SOIL |
3/29/2019 8:22:44 AM
| krobshaw |
|
TERMITE PROTECTION CERT OF COMPL
| |
10/3/2019 10:26:34 AM
| cgalloway |
|
HOLD FINAL FOR METAL ROOF PERMIT
| |
7/23/2019 4:17:47 PM
| slhersey |