|
BAY WIND/FPLACE/EAVES/MAX 3 FT. PROJECTION
| |
| |
|
EARLY POWER LETTER REC'D
| |
11/8/2018 3:06:48 PM
| cgalloway |
|
EXISTING RESIDENCE TO BE REMOVED PRIOR TO C/O
| DETACHED 2 CAR GARAGE STILL ON PROPERTY, NO MAIN RESIDENCE |
11/16/2018 10:30:04 AM
| cgalloway |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
5/22/2018 11:06:31 AM
| kallen |
|
IMPACT FEE DUE Zero Out
| |
5/29/2018 11:42:21 AM
| amcbroom |
|
INFO NOC-
| BK 4568 PG 366 |
6/28/2018 3:03:30 PM
| bcalaman |
|
LANDSCAPE INSPECTION REQ
| |
10/26/2018 3:21:53 PM
| |
|
METER CAN INSPECTION
| |
10/25/2018 2:24:40 PM
| air |
|
SEPTIC TANK FINAL REQ
| |
11/16/2018 3:48:52 PM
| ehealth |
|
SOLID WASTE FEE DUE
| ANNUAL ASSESSMENT $222.00 |
6/28/2018 11:05:35 AM
| ccontestabile |
|
SWALE/CULVERT FINAL INSP REQ
| |
11/8/2018 2:57:27 PM
| |
|
TERMITE BOND CO
| FLORIDA; SOIL & WOOD |
6/28/2018 11:05:13 AM
| ccontestabile |
|
TERMITE PROTECTION CERT OF COMPL
| |
11/13/2018 11:07:52 AM
| cgalloway |
|
HOLD FINAL FOR METAL ROOF PERMIT
| 11813103 |
9/14/2018 1:53:09 PM
| bshugart |