5th Edition FBC (2014)
| |
| |
|
EARLY POWER LETTER REC'D
| |
7/10/2017 10:01:30 AM
| edegrande |
|
FEMA FORM REQUIRED
| AH-7. H-15.0. G-11.3. BD-1B. |
12/15/2016 8:58:21 AM
| jdacosta |
|
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL
| |
9/26/2016 7:51:05 AM
| kallen |
|
HOLD C/O: ORIGINAL FINISHED CONST FEMA
| |
12/7/2017 11:17:10 AM
| jadams |
|
IMPACT FEE DUE Zero Out
| |
10/19/2016 2:19:41 PM
| kallen |
|
INFO NOC-
| BK 4281 PG 289 |
11/3/2016 2:10:19 PM
| edegrande |
|
LANDSCAPE INSPECTION REQ
| |
12/8/2017 4:07:09 PM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
12/7/2017 1:17:15 PM
| |
|
METER CAN INSPECTION
| |
7/13/2017 1:53:12 PM
| air |
|
SOLID WASTE FEE DUE
| REPLACEMENT SINGLE FAMILY |
10/19/2016 12:11:14 PM
| avaden |
|
TERMITE BOND CO
| NADERS SOIL |
10/19/2016 11:58:32 AM
| avaden |
|
TERMITE PROTECTION CERT OF COMPL
| |
12/12/2017 10:24:35 AM
| cgalloway |
|
SEPERATE PERMITS FOR METAL AND TILE ROOF:11715191
| TILE PERMIT WAS PULLED METAL ROOF WAS NOT USED PER ROOFER |
12/14/2017 3:37:53 PM
| mkuehne |
|
HOLD FINAL
| NEED ENERGY SHEET TO MATCH TILE ROOF |
12/18/2017 10:46:19 AM
| jadams |
|
HOLD FINAL REVISE TRUSS ENGINEERING TILE ROOF
| |
12/21/2017 9:04:51 AM
| jadams |