|
2010-FL BLDG CODE
| |
| |
|
BAY WIND/FPLACE/EAVES/MAX 3 FT. PROJECTION
| |
| |
|
EARLY POWER LETTER REC'D
| |
2/26/2014 4:21:52 PM
| khart |
|
FEMA FORM REQUIRED
| AE-9, X-NA RECVD AT 13.0 |
10/31/2013 2:41:31 PM
| khart |
|
HOLD C/O: ORIGINAL FINISHED CONST FEMA
| GAR 10.6 EQUIP 10.5 |
3/12/2014 2:47:57 PM
| khart |
|
IMPACT FEE DUE
| 14-006739 |
2/26/2014 11:10:31 AM
| jnoon |
|
INFO NOC-
| OR 3775 PG 419 |
9/12/2013 1:38:23 PM
| ddoak |
|
LANDSCAPE INSPECTION REQ
| |
3/6/2014 2:31:08 PM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
3/7/2014 7:34:25 AM
| |
|
METER CAN INSPECTION
| |
1/22/2014 11:08:08 AM
| |
|
PAID UTILITY RECEIPT REQUIRED
| |
9/12/2013 1:38:36 PM
| ddoak |
|
SEPTIC TANK FINAL REQ
| |
3/6/2014 2:03:20 PM
| ehealth |
|
SOLID WASTE FEE DUE
| 14-006739 |
2/26/2014 11:10:31 AM
| jnoon |
|
SWALE/CULVERT FINAL INSP REQ
| |
3/13/2014 1:05:20 PM
| |
|
TERMITE BOND CO
| FLORIDA PEST/SOIL |
9/11/2013 2:25:22 PM
| cgalloway |
|
TERMITE PROTECTION CERT OF COMPL
| |
3/11/2014 11:01:55 AM
| khart |
|
HOLD CM RGH FOR WINDOW TYPE-ENERGY FORM&PROD APPR-NO MATCH
| |
12/11/2013 3:55:32 PM
| dgriffin |
|
HOLD CM RGH FOR ES REPORT ON SPRAY FOAM
| |
12/11/2013 3:55:34 PM
| dgriffin |