SJC Home
DescriptionInputDateWho
7th Edition FBC (2020)    
BAY WIND/FPLACE/EAVES/MAX 3 FT. PROJECTION    
EARLY POWER LETTER REC'D   11/10/2021 8:24:08 AM tcarroll
ENGINEER ELEVATION CERTIFICATION   7/27/2021 8:56:37 AM tsteven
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL   3/9/2021 1:46:37 PM tsteven
IMPACT FEE DUE 21-073414 11/9/2021 11:03:40 AM Lexis
INFO NOC- BK 5195 PG 1704 4/14/2021 10:01:22 AM slhersey
LANDSCAPE INSPECTION REQ   11/24/2021 8:45:35 AM nwalters
LOT GRADING INSP REQ PRIOR C/O   11/30/2021 10:36:52 AM  
METER CAN INSPECTION   11/10/2021 10:04:26 AM Air
PAID UTILITY RECEIPT REQUIRED COSA 11/24/2021 2:16:16 PM slkling
SOLID WASTE FEE DUE 21-073924 11/11/2021 11:55:37 AM Lexis
TERMITE BOND CO NADERS; BAIT 4/14/2021 10:07:41 AM slhersey
TERMITE PROTECTION CERT OF COMPL   11/22/2021 2:59:15 PM kcooper