EARLY POWER LETTER REC'D   9/2/2022 11:49:18 AM kturner
ENGINEER ELEVATION CERTIFICATION   5/23/2022 8:01:59 AM wwoodward
HOLD C/O FOR SUBDIVISION ASBUILT APPROVAL   2/24/2023 2:41:16 PM dwintons
IMPACT FEE DUE 22-058267 9/2/2022 11:46:49 AM mthom
INFO NOC- 5467/890 2/18/2022 10:03:23 AM ccontestabile
LANDSCAPE INSPECTION REQ   3/1/2023 1:34:39 PM  
LOT GRADING INSP REQ PRIOR C/O   2/28/2023 1:06:21 PM  
METER CAN INSPECTION   9/6/2022 11:46:36 AM air
PAID UTILITY RECEIPT REQUIRED JEA 2/18/2022 10:03:10 AM ccontestabile
SOLID WASTE FEE DUE 22-011743 2/22/2022 1:49:00 PM dwint
TERMITE BOND CO NADERS; SOIL 2/18/2022 10:03:32 AM ccontestabile