|
IMPACT FEE DUE
| 97-000268 1,387.00 |
1/7/1997 12:00:00 AM
| TM |
|
INFO NOC-
| OR1213 PG1191 |
| |
|
INFO NOC-
| 25 REINSPECTION UNDERSLAB 1/14/97 JS NO NOC |
2/7/1997 12:00:00 AM
| TM |
|
SOLID WASTE FEE DUE
| |
2/7/1997 12:00:00 AM
| TM |
|
METER CAN OK/JS REL 2/14/97 TM
| |
| |
|
TERMITE BOND B&B
| |
| |
|
HOLD CO FOR ENGINEERING (LOT GRADING)
| |
4/8/1997 12:00:00 AM
| SRM |
|
HOLD CO FOR ENGINEERING (BOND)
| |
1/23/1997 12:00:00 AM
| BSS |
|
25 REINSPECT FEE 2/14/97 INSULATION JS
| |
3/12/1997 12:00:00 AM
| TM |
|
REINSP ON ROUGH-APPROVED BE RERELEASE TO JEA
| |
4/7/1997 12:00:00 AM
| TC |
|
FINAL TERMITE CERTIFICATE BEFORE C/O
| |
4/11/1997 12:00:00 AM
| BE |
|
RECVD SIGNED EP LETTER-HOLD POWER FOR APPROVAL #11
| |
4/4/1997 12:00:00 AM
| SB |