7th Edition FBC (2020)
| |
| |
|
EARLY POWER LETTER REC'D
| |
3/1/2023 9:19:06 AM
| ccontestabile |
|
ENGINEER ELEVATION CERTIFICATION
| |
9/8/2022 3:35:20 PM
| mthomas |
|
HOLD C/O FOR SITE ASBUILT APPROV
| |
1/27/2023 12:46:37 PM
| smorrison |
|
IMPACT FEE DUE
| 22-060404 |
9/13/2022 3:39:54 PM
| mthom |
|
INFO NOC-
| 5579;1744 |
6/16/2022 10:25:33 AM
| bbonfanti |
|
LANDSCAPE INSPECTION REQ
| |
3/21/2023 10:42:23 AM
| |
|
LOT GRADING INSP REQ PRIOR C/O
| |
3/7/2023 1:17:22 PM
| |
|
METER CAN INSPECTION
| |
3/1/2023 1:09:59 PM
| air |
|
PAID UTILITY RECEIPT REQUIRED
| JEA |
3/7/2023 10:49:34 AM
| bshugart |
|
SOLID WASTE FEE DUE
| 22-039598 |
6/13/2022 12:06:52 PM
| ecann |
|
TERMITE BOND CO
| TURNER;WOOD |
6/7/2022 7:56:35 AM
| kcooper |
|
TERMITE PROTECTION CERT OF COMPL
| |
1/4/2023 11:10:41 AM
| slkling |