8TH EDITION FBC (2023)
| |
| |
|
EARLY POWER LETTER
| |
| |
|
ENERGIZE BLDG INSPECTION
| |
| |
|
HOLD 109 INSP FOR FIRE ALRM PRMT
| W/VOICE EVAC (FA001),( A-010 NOTE # 5) |
| |
|
HOLD 109 INSP FOR FIRE SPRNKLR PRMT
| |
| |
|
HOLD 109 INSP FOR UNDERGROUND PERMIT
| |
| |
|
HOLD BLDG FINAL INSP FOR FIRE MARSHAL FINAL.
| |
| |
|
HOLD C/O FOR SITE ASBUILT APPROV
| |
| |
|
IMPACT FEE DUE
| |
| |
|
INFO NOC-
| |
| |
|
LANDSCAPE INSPECTION REQ
| TO BE CAPTURED AT TIME OF AS-BUILT |
| |
|
PAID UTILITY RECEIPT REQUIRED
| SJCUD |
| |
|
TERMITE BOND CO
| |
| |
|
TERMITE PROTECTION CERT OF COMPL
| |
| |
|
HOLD FINAL FOR SEPARATE ROOF PERMIT
| TPO |
| |
|
HOLD 105 INSP - BDA EVALUATION / TEST
| SHEET A-010 NOTE #5 |
| |
|
HOLD 105 INSP - FIRE/SMOKE DAMPER TEST - INSP
| |
| |
|
HOLD 105 INSP - REVISION TO ADDRESS COMMENT #4.
| DOOR AND HARDWARE SCHEDULES |
| |