7th Edition FBC (2020)
| |
| |
|
DOT CONNECTION PERMIT REQ'D
| NEED PROOF FROM DOT OF ACCEPTANCE (EC) |
12/20/2023 10:55:19 AM
| hsapp |
|
EARLY POWER LETTER REC'D
| |
9/7/2023 9:12:06 AM
| kcooper |
|
ENERGIZE BLDG INSPECTION
| |
9/6/2023 9:05:21 AM
| air |
|
HOLD BLDG FINAL INSP FOR FIRE MARSHAL FINAL.
| |
11/20/2023 1:36:14 PM
| |
|
HOLD C/O FOR SITE ASBUILT APPROV
| OK FOR TCO PER TECH (EC) UNTIL 1/12/24 |
12/19/2023 3:33:09 PM
| hsapp |
|
IMPACT FEE DUE
| 23-054839 |
9/13/2023 12:56:52 PM
| tclif |
|
INFO NOC-
| 5576 / 630 |
6/9/2022 4:07:18 PM
| clschmermund |
|
LANDSCAPE INSPECTION REQ
| LANDSCAPE WILL BE INSPECTED AT TIME OF ASBULT |
11/13/2023 3:04:22 PM
| |
|
PAID UTILITY RECEIPT REQUIRED
| |
12/7/2023 10:28:20 AM
| kcooper |
|
REINSPECTION FEE
| 23-069443 |
11/17/2023 3:20:11 PM
| Lexis |