SJC Home
DescriptionInputDateWho
6th Edition FBC (2017)    
Architectural approval required   11/19/2018 5:41:42 PM ckeough
Building Elevations Required   11/19/2018 5:41:43 PM ckeough
EARLY POWER LETTER REC'D   11/28/2018 9:01:37 AM cgalloway
EARLY POWER LETTER REC'D 21807511 1/14/2019 12:18:55 PM cgalloway
ENERGIZE BLDG INSPECTION   12/4/2018 11:12:22 AM air
FEMA FORM REQUIRED ENTIRELY IN [X] A-U, AE-U, X-NA 7/2/2018 2:28:58 PM fbecza
HOLD 109 INSP FOR FIRE ALRM PRMT   8/15/2018 1:23:27 PM VVitori
HOLD 109 INSP FOR FIRE SPRNKLR PRMT   10/16/2018 12:23:10 PM VVitori
HOLD 109 INSP FOR UNDERGROUND PERMIT   6/7/2018 9:49:14 AM SMurray
HOLD BLDG FINAL INSP FOR FIRE MARSHAL FINAL.   2/1/2019 9:44:57 AM air
HOLD C/O FOR SITE ASBUILT APPROV   2/1/2019 2:10:39 PM bpowelson
HOLD C/O: ORIGINAL FINISHED CONST FEMA   7/2/2018 2:29:33 PM fbecza
IMPACT FEE DUE 18-062780 11/21/2018 8:55:38 AM hmast
INFO NOC- BK 4560 PG 1183 6/8/2018 9:30:30 AM bcalaman
LANDSCAPE INSPECTION REQ   12/19/2018 7:52:35 AM  
PAID UTILITY RECEIPT REQUIRED JEA PRE ACCEPTANCE LETTER OR RECEIPT 11/27/2018 2:28:50 PM cgalloway
REINSPECTION FEE 19-006414 2/1/2019 3:38:10 PM hmast
REINSPECTION FEE 19-006414 2/1/2019 3:38:10 PM hmast
TERMITE BOND CO PROTEC SERVICES; SOIL 6/6/2018 11:46:00 AM slhersey
TERMITE PROTECTION CERT OF COMPL   12/20/2018 10:12:55 AM bcalaman
104 , 106 , 123 FOR WELD / BOLT CERTIFICATION   11/19/2018 7:10:51 AM fbecza
123SERVICE EQUIP.MARKED WITH MAX FAULT CURRENT AVAILABLE   2/1/2019 2:50:02 PM khart