2010-FL BLDG CODE
| |
| |
|
EARLY POWER LETTER REC'D
| |
11/29/2012 3:01:09 PM
| khart |
|
ENERGIZE BLDG INSPECTION
| |
11/29/2012 2:29:29 PM
| |
|
HOLD 109 INSP FOR FIRE ALRM PRMT
| |
10/22/2012 8:22:05 AM
| smurray |
|
HOLD 109 INSP FOR FIRE SPRNKLR PRMT
| |
10/22/2012 8:22:08 AM
| smurray |
|
HOLD BLDG FINAL INSP FOR FIRE MARSHAL FINAL.
| |
12/20/2012 11:27:45 AM
| |
|
HOLD C/O FOR SITE ASBUILT APPROV
| OK FOR TCO THROUGH 2/15/13 J. BURNHAM |
2/8/2013 4:43:53 PM
| bpowelson |
|
IMPACT FEE DUE
| 12-033179 |
12/14/2012 12:33:17 PM
| lmsil |
|
INFO NOC-
| OR 3629 PG 870-872 |
10/16/2012 9:50:55 AM
| ccontestabile |
|
LANDSCAPE INSPECTION REQ
| TCO APPRVD CATHLEEN KABAT |
12/21/2012 4:19:14 PM
| |
|
REINSPECTION FEE
| 12-033106 |
12/13/2012 3:53:07 PM
| jnoon |
|
SEPTIC TANK FINAL REQ
| PER LORIE |
12/13/2012 3:27:00 PM
| edegrande |
|
TERMITE BOND CO
| HERITAGE PEST/SOIL |
10/12/2012 9:17:23 AM
| cgalloway |
|
TERMITE PROTECTION CERT OF COMPL
| |
2/7/2013 9:37:00 AM
| ccontestabile |
|
NEED FAULT CURRENT LETTER
| |
10/16/2012 2:22:57 PM
| ccrain |
|
HOLD 105 INSP FOR SEALED & REVIEW STEEL SHOP DRAWINGS
| |
11/14/2012 3:15:08 PM
| ccrain |
|
HOLD FOR FIRE ALARM LETTER FROM ENGINEER
| |
10/24/2012 8:42:02 AM
| jruley |
|
HOLD BP FOR SEALED COPY OF SPRINKLER DESIGN CRITERIA
| |
10/24/2012 8:42:09 AM
| jruley |