8TH EDITION FBC (2023)
| |
| |
|
ENERGIZE BLDG INSPECTION
| |
| |
|
FEMA FORM REQUIRED
| A-U, AE-32, AE-35, X-NA |
9/18/2025 1:19:08 PM
| jedwards |
|
HOLD 109 INSP FOR EXHST HD PRMT
| |
| |
|
HOLD 109 INSP FOR FIRE ALRM PRMT
| EXISTING SYSTEM |
| |
|
HOLD 109 INSP FOR FIRE SUP PRMT
| |
| |
|
HOLD BLDG FINAL INSP FOR FIRE MARSHAL FINAL.
| |
| |
|
HOLD C/O FOR SITE ASBUILT APPROV
| |
| |
|
HOLD C/O: ORIGINAL FINISHED CONST FEMA
| |
9/18/2025 1:19:12 PM
| jedwards |
|
IMPACT FEE DUE
| |
5/16/2025 9:56:02 AM
| lbrown |
|
INFO NOC-
| NEED BEFORE FIRST INSPECTION |
| |
|
LANDSCAPE INSPECTION REQ
| |
| |
|
HOLD 105 INSP FOR BDA TEST/EVALUATION
| |
| |
|
HOLD 105 INSP FOR FIRE / SMOKE DAMPER INSP /TEST
| |
| |