|
2001-FL BLDG CODE
| |
| |
|
EARLY POWER LETTER REC'D
| |
2/13/2004 12:00:00 AM
| KH |
|
HOLD BLDG FINAL INSP FOR FIRE MARSHAL FINAL.
| approved |
3/23/2004 12:00:00 AM
| PJW |
|
HOLD C/O FOR SITE ASBUILT APPROV
| ok for temp c/o to 3/30/04 DJH |
4/6/2004 12:00:00 AM
| DH |
|
INFO NOC-
| OR 1959/PG 1173 |
8/22/2003 12:00:00 AM
| EJH |
|
LANDSCAPE INSPECTION REQ
| |
3/10/2004 12:00:00 AM
| JRM |
|
METER CAN INSPECTION
| NEED ENERGIZE BUILDING INSPECTION |
2/13/2004 12:00:00 AM
| JRM |
|
PAID UTILITY RECEIPT REQUIRED
| |
2/27/2004 12:00:00 AM
| KH |
|
TERMITE BOND CO
| TURNER; SOIL METHOD |
1/9/2004 12:00:00 AM
| JO |
|
TERMITE PROTECTION CERT OF COMPL
| |
5/21/2004 12:00:00 AM
| KH |