| 42214985 |
We will be running high pressure gas line from the meter over to the kitchen area where customer will have a future grill ,griddle ,and crab pot boiler . We will be installing the regulator outside of the countertop area and will be running track pipe with the shut off valves to each fixture
Running high-pressure gas line to the corner of the pool area for the future fire pit that will be in the corner. Customer already has sleeving ran from the meter to this area. we will cap this line off and put a valve on it for the future fire pit
Running high-pressure line from the meter over to the waterfall area where there will be a future fire pit coming out of the waterfall we will be putting a gas valve and a cap for the future fire pit
We will be teeing off existing high-pressure line that feeds the water heater near the pool equipment we will bury the line and run it over to where the pool heater will be we will rise out of the ground and cap this line for whenever the customer gets their pool heater
|
10/19/2022 9:39:28 AM * kcooper
|
| 22206279 |
Wiring for new pool
|
5/23/2022 8:24:33 AM * bbonfanti
|